Wednesday, September 16, 2009

Walled In

So the day after the drywall was delivered the hangers showed up. Just a 2 guy crew. They started with the basement and worked their way up through the house. Here are some pictures of the basement, kitchen and master bedroom.











It took them about 6 days for them to get it done. After they were done I spent one evening rolling paper over all the floors. Thanks to a company I deal with at work who gave me the ends of their paper rolls. The next day the 2 man mudding and taping crew showed up. It took them about a week and a half to do the entire house. Some more pics of the master bedroom and great room.





After they were done the priming and texture crew came in on Monday. They were able to do both in one day which was great. While all this was going on I've been working on staining and putting up more siding, rewiring the radiant heat pump with conduit, and cleaning up outside so the septic system can get installed. Now I get to jump back inside and start priming, painting and doing cabinets. Here is what it looks like now, kitchen, master bedroom and great room.


I also have been posting a bunch to facebook so if you're on there send me a friend request. Gotta get back to work now!